top of page
(386) 788-9899
QUALIFICATION DETAILS
Written Exam Required.
Allowed up to 2 Hours to complete the Written Exam.
Open Study Guide Written Exam.
Proficiency Exam NOT Required.
Initial Qualification Requirements:
Pass Concrete Batch Plant Operator Written Exam
Have 90 days work experience in Batch Plant operations including the batching of fresh concrete, proportioning concrete mix designs, determining the moisture content of aggregates and calculating the water to cementitious materials ratio.
Re-Qualification Requirement:
Same as Initial Qualification.
bottom of page